Achievements of Hydro Power under
MWR System in 2000
Newly increased installed capacity under MWR system: 3,560MW,
with
SHP: 1,506MW
MHP: 554MW
LHP: 1,500MW
Up to the end of 2000, total installed capacity of hydropower
under MWR system: 34,240MW, accounting for 44,5% of total
installed hydropower capacity nationwide, with
SHP: 24,851.7MW
MHP: 2,662.3MW
LHP:3,590MW
Electricity generated in 2000 under MWR system: 104.242GWH,
13.1GWH more than that in 1999; accounting for 39,4% of
total hydropower electricity nationwide, increasing 16,2%
over the percentage of 1999.
Capital input in hydropower construction in 2000 under MWR
system: 25.078 billion RMB Yuan, with:
Power Station: 10.191 billion RMB Yuan (40,64%)
Power Grid: 12.336 billion RMB Yuan (49,19%)
Others: 2.551 billion RMB Yuan (10,17%)
Capital input in rural power grid renovation in 2000: 6,64
billion RMB Yuan, 56,1% of planned target.
Capital spent in rural power grid renovation in 2000: 8.08
billion RMB Yuan, 68,3% of planned target.
Accomplished projects in rural power grid renovation in
2000
Reforming rural electricity administration departments:
1849
Newly constructed/renovated rural electricity facilities
Rural electricity supply stations: 1243
-
110 Kv substations: 41/173MVA
-
35 Kv substations: 241/1,257MVA
-
110 Kv power line: 834.5 km
-
35 Kv power line: 4,718 km
-
10 Kv power line: 44,900 Km
-
Low-voltage power line: 126,000km
-
Transformer: 35,689/2,483.5MVA
-
Reforming electricity distribution
blocks: 47,227
Up to the end of 2000, total fixed assets
of hydropower industry under MWR system: 149.71 billion RMB
Yuan, with Power sources: 118.907 billion RMB Yuan (79,42%).
Power grid: 30.804 billion RMB Yuan (20.58)
Small
Hydro Poer In China
|